A1A6 Zagreb – Split – Ploče, and Bosiljevo – Rijeka
Gornja Ploča to Čarapine
€19.70
by car, one way. Čarapine to Gornja Ploča costs the same, so there and back is €39.40.
278 km of motorway, about 2 h 50 min without stops.
| Category | Vehicle | Toll |
|---|---|---|
| IA | MotorcycleMotorcycles, motor tricycles and quad bikes | €11.70 |
| I | CarTwo-axle vehicles up to 1.90 m high: cars and most small vans | €19.70 |
| II | Car with trailer / camperTwo-axle vehicles above 1.90 m up to 3,500 kg, and any car or motorcycle towing a trailer | €29.60 |
| III | Bus / truckTwo- or three-axle vehicles over 3,500 kg, and a category II van or camper towing a trailer | €40.30 |
| IV | Heavy truckVehicles over 3,500 kg with four or more axles | €59.10 |
Prices include VAT. Source: HAC price list, checked on 19 October 2026. Not sure which row is yours? See vehicle categories.
The road
You pass 20 exits on the way. The price next to each is the car toll if you leave there instead.
- Gornja Pločayou join here
- Sveti Rok€0.40
- Rovanjska€2.80
- Posedarje€3.20
- Zadar centar€3.40
- Zadar istok€4.10
- Benkovac€5.20
- Vodice€6.70
- Skradin€7.40
- Šibenik€8.00
- Podi€8.60
- Danilo€9.00
- Prgomet€10.10
- Vučevica€11.20
- Split€12.20
- Bisko€13.10
- Blato na Cetini€14.40
- Šestanovac€14.90
- Zagvozd€15.60
- Ravča€17.60
- Vrgorac€18.40
- Ploče junction, the end of the A1
- Čarapine€19.70
On the way: the Sveti Rok tunnel (5.7 km), the Maslenica bridge (378 m), the Krka bridge (391 m), the Konjsko tunnel (1.3 km) and the Kotezi viaduct (1.2 km).
In strong bura the stretch from Sveti Rok to Posedarje is closed to everything but cars, and in the strongest to all traffic: see when the wind closes the motorway.
Towns near these exits
Gornja Ploča is the exit for Udbina (21 min), Crni Lug (38 min), Korenica (44 min), Jezerce (57 min), Plitvice Lakes (1 h 2 min), Plitvička Jezera (1 h 3 min).
Čarapine is the exit for Ploče, Bosnian border (Nova Sela), Prud (13 min), Momići (15 min), Kobiljača (16 min), Vid (16 min).
Minutes are by ordinary road from the exit, estimated from map data.